Fabrication Facility

  • 62,000² ft  fabrication with 32 ft. crane clearance
  • 15 ton overhead cranes (3)
  • Plant Steam, 60 HP 125 PSI
  • Clean Steam, 1800 pounds/hr @ 45PSIG
  • Pure Water system, 4,000G/DAY R.O./D.I.
  • Clean Dry Air, 40 HP screw
  • Glycol chiller, 100 ton@ 0°C

BAP

MC Buffer Prep Room

  • ASME and CE PED code shop
  • U STAMP
  • UM STAMP
  • R STAMP
  • P STAMP
  • ASME BPE compliant High Purity Piping
  • Electrical panel fabrication
  • Conduit and wiring fabrication
  • In House Citric Passivation
  • In House Electropolishing
  • GTAW, TIG, MIG welding

MC Ferm Installed